![]() ![]() And a 20,000 line stand alone project with no external link has almost no delay in calculation. ![]() Even 10,000+ lines is normal on my projects. If youre using Project Server network limitations can cause a problem especially over a Citrix connection.(In my case India to Atlanta, acceptable but slow, 3-6 second response time)ġ000 lines is not a large file. How slow a file reacts is based on its size, external links, and the speed/memory of the computer being used. On my projects the details of Functional, System, and Performance Testing are broken out into a separate WBS and include Environment setup as well as links to Hardware Procurement/Configuration WBSs. ![]() There is a practical size limitation to a WBS that comes into play before hardware/network limitations do.ĭepending on the size of the Project each phase, Requirements, Design, Development, Testing, Implementation, can all have their own WBS with cross links. If predecessor/successor date calculations had to be done I suspect I could lock up my PC. On my test file, just adding tasks, my laptop was taking over 3 minutes to just add text (1000 lines at a time) when I got over 50,000 lines. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |